Work Session June 27, 2020
To join the fun, contact the railroad at: WorkSession @ RedRiverAndGulf.net (no spaces)
|
Team: Gerald Winegeart
Thank you to Mike for securing
some great red dirt and placing it in the shop before the rains came
down.
Good progress was made on the
machine shop track rebuild today. In the weeks prior, Mike was able to
secure 14 yards of red dirt with a good clay content and placed it in
the machine shop track area. It hardened up some and it will make a
fantastic material base for the machine shop track. Gerald showed Mike
and I the homemade tractor blade on hand at the museum and we used it on
the tractor to level out the red dirt. After lunch, we began placing
cross ties down. We placed them on 24 inch tie centers and used the
level as we went.
-Tucker Baker |
|
|
|
|